Skip to main content

New firm for bridge

October 14, 2013

Reinhart

After the low bidder failed to secure all the materials needed for a planned bridge project on Deep Cut Road, the contract has been awarded to the second lowest bidder.
In late July, the Auglaize County commissioners awarded the bridge project over the Miami and Erie Canal to Hume Supply, of Lima, for approximately $112,730.
For more information, see the Saturday, Oct. 12 edition of the Wapakoneta Daily News.

From staff reports The Wapakoneta Redskins used a pair of eight-run innings as part of two wins...
The only walk of the game was basically intentional. It loaded the bases with two outs in the...
Despite being the visiting team on their home field, a patient Wapakoneta Redskins team rallied...

 

Classified Ads

Premium Drupal Themes by Adaptivethemes